Alterations to existing building and refurbishment of the existing sixth form centre. The works included structural alterations and reconfiguration of the existing space, new suspended ceilings, air conditioning, lighting, power, data, floor coverings, redecorations and new glass doors. All works were commenced and completed during the summer holiday period.